RBPFMS software is an IT Tool developed for managing information relating to RBM based project plans, log frame, action plan and to capture data relating to the plan implementation resulting in generating monitoring information required for an effective monitoring of development programs.
MASTER DATA
1. PROJECT INFO
Project Title, Project Identification Number, Term of the project, Project Start Date, Budget Years and Contact info details are
collected.
1.1 LOG FRAME
STRUCTURE
Logical interventions and their major classifications used in the project log frame are decided in this stage
1.2 TARGET INFO
Fixing of number of tiers Various target information as to their group name, sub groups within the main group and basic target names are assigned
.
1.3 GEOGRAPHICAL
INFO
Geographical divisions used in the project are fixed i.e Country, State, District and Location Various name of the geographical divisions are entered in the system as master
info.
1.4 RESOURCE
INFO
Resources required for the activities of the project are classified into Human Resources, Movable Assets, Consumable Resources, IEC Materials and other resources are detailed with the name of the resource, resource identification number, resource type and basic info related to the
resource.
2. LOGICAL FRAMEWORK
ANALYSIS
2.1 Setting of Log Frame
Structure:
First the logical framework structure is decided with respect to the number of tiers and their names.
The no of tiers including sub-inputs is limited to five.
2.LOGICAL INTERVENTION
DETAILS
Logical intervention details are collected. This process can be made easy through cutting and pasting of information from MS-EXCEL spreadsheets.Impact, Outcome, Results and Inputs are classified according to the tier and a code is generated for each logical intervention and necessary explanations added to these as needed.
2.2 RESULTS
PLAN
Indicators expected out of the project interventions are listed against each intervention. This is a qualitative information which is also quantified.
2.3 MEANS OF
VERIFICATION
Verifiable sources of such indicators are assigned . Information in a tabular form in ms-excel or ms-word can be transferred to LFA using
cut/paste.
2.4 ASSUMPTIONS
Hypothetical assumptions to achieve results are to be filled in this column. Information in a tabular form in ms-excel or ms-word can be transferred to LFA using
cut/paste.
3. ACTION PLAN
Plan of action in respect of each inputs should be assigned with regard to the time frame for each event, target planned in quantity, resource requirements, areas of action and personnel responsible for such actions.
4. FINANCE PLAN
Cost implication for the inputs of the project are given through finance plan.
5. UPDATES
1. ACTION
UPDATE:
Activity commencement , activity completion, target achieved, resources utilized, learnings, etc are updated into the system in a periodic
manner.
2. FINANCE
UTILISATION:
Finance utilized for each activity in a select month are captured.
3. INDICATORS
PRESENT:
Indicators identified in the project are captured into the system with quantitative details and the period of their occurrence .
REPORTS
The software facilitates tracking of events, deviation from event plans, resource plans, cost plans , target plans and their impact plan.Important reports like Event dairy, Resource Log Book, Cost Schedules, Cost analysis, Impact indicators and Action Plan can be generated .
MONITORING INFORMATION SYSTEM
This software generates the following reports:
6. IMPORT AND EXPORT OF DATA
Data from distantly located projects can be imported into the consolidation software used at the Apex Level Office via e-mail from projects through data export utility
|